Sign In | Join Free | My gimpguru.org |
|
Brand Name : Air Giant
Model Number : QMP32/2.5, QMP40/4.2, QMP52/2.5, QMP70/4.2, QMP100/4.2, QMP106/2.5, QMP120/4.2, QMP147/2.5, QMP150/4.2, QMP180/2.5, QMP180/4.2
Certification : CAL,CMA,CNAS,ILAC-MRA,CCC
Place of Origin : China
MOQ : 1 set
Price : negotiation
Payment Terms : L/C , D/P, T/T, Western Union, Paypal, Credit card
Supply Ability : 28000 sets per week
Delivery Time : 10-15 working days
Packaging Details : Plywood outer box with bubble bag or paper
Model No. : QMP32/2.5, QMP40/4.2, QMP52/2.5, QMP70/4.2, QMP100/4.2, QMP106/2.5, QMP120/4.2, QMP147/2.5, QMP150/4.2, QMP180/2.5, QMP180/4.2
Storage pressur : 4.2MPa
Volume (L) : 40, 70, 100, 120, 150, 180
Internal diameter(mm) : 300, 350, 400
Cylinder For FK 5-1-12 Fire Suppression System Without Pollution In Telecommunication Room
The table shows the specific parameters of several conventional bottles of different sizes:
Cylinder 40L 70L 90L 100L 120L 150L 180L | |||||||
Nominal volume(L) | 40 | 70 | 90 | 100 | 120 | 150 | 180 |
Filling capacity(kg) | 46.4 | 81.2 | 104.4 | 116 | 139.2 | 174 | 208.8 |
Designed thickness of cylinder(mm) | 5.4 | 6.3 | 6.3 | 6.3 | 6.3 | 7.2 | 7.2 |
Designed thickness of head(mm) | 4.8 | 5.7 | 5.7 | 5.7 | 5.7 | 6.5 | 6.5 |
Material standard | GB6653-2008 | ||||||
Specified value of chemical ingredients of material | C<0.20% Si<0.35% Mn<1.50% P<0.025% S<0.015% P+SM0.04% | ||||||
Test of hydraulic pressure | 8.4MPa | ||||||
Test of sealing pressure | 5.6MPa |
Components
The bottle part is composed of steel cylinder and cylinder valve
Application
Electronic computer room, a data processing center, telecommunications facilities, process control, expensive medical equipment, industrial equipment, library, museum and art gallery, clean room, anechoic chamber, emergency power facilities, flammable liquid storage area, etc.
The place where the fire is easy to happen, like paint-spraying production line, aging-electrical equipment, rolling machine, printing machine, oil switch, oil immersed transformer, melt impregnating tank, tank, large generators, drying equipment, cement pro duction process of pulverized coal, and the ship's engine room, cargo hold, etc.
Package
We always pack it with polyfoam firstly and then put it into a wooden case. Sometimes, in order to meet with customers or the safety requirement, we will make a pallet for the goods.
![]() |
FK 5-1-12 Fire Suppression System Novec 1230 Cylinders In Telecommunication Room Images |